Project phases
- 1
Location study
Population density, competition, visibility, pedestrian access, parking and the mix of nearby housing.
- 2
Lease and licences
Business licence, IAE 971.1 code, electrical certificate and public liability insurance.
- 3
Technical services
Three-phase 400 V (40–80 kW), water at 3 bar, drainage, ventilation and extraction.
- 4
Machinery
Recommended 8/11–14/18–27 kg mix depending on the size of the premises.
- 5
Chemical supplier selection
- 6
Installing automatic dosing
Peristaltic pumps, connection to each washing machine and initial calibration.
- 7
Training and trials
Staff training (where applicable) and trials with different load sizes.
- 8
Public opening
Local marketing, signage and fully operational payment systems.